Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | China |
---|---|
Brand Name: | Dehai Boiler |
Certification: | ISO9001 , SGS , ABS , ASME |
Model Number: | Boiler Header |
Minimum Order Quantity: | 5 Tons |
Price: | Negotiable |
Packaging Details: | Seaworthy packing |
Delivery Time: | 50 Days |
Payment Terms: | L/C, T/T |
Supply Ability: | 500 Tons / Month |
Working Temp.: | 450 ℃ | Material: | 15CrMoG / 12Cr1MoVG |
---|---|---|---|
Working Condition: | Ultra Super Critical | Color: | Customized |
Packing: | Iron Fram | Condition: | New |
High Light: | low loss header,copper manifold |
Carbon Steel Manifold Headers For Boiler Connection System Pressure Parts
Carbon Steel Manifold Headers Introduction
1. The headers of boilers include water-cooling hinders of boilers proper, economizer hinders, superheater hinders, etc.
2. They function for gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.
3. Headers form an important part of all types of boilers.
4. Steam from the generating tubes is collected in headers which are therefore always under pressure.
5. This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
6. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.
Features
1.Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi.
2. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers
3. Bevelling and weld preparation of stubs duly tack-welded to the main body of the header are first shown to Chief Inspector of Boilers for his approval and once again the stubs fully welded with main body are shown to Chief Inspector of Boilers under hydraulic pressure, varying from 1000 to 3000 psi as required by the specifications.
4. The headers are stamped by Chief Inspector of Boilers before they leave our manufacturing plant. We also weld skubolets and weldolets in place of stubs.
Details
1. The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
2. Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.
Specification
Material | Carbon steel,Alloy steel,Stainless steel. |
Length | According to costumes requirements. |
Temperature Range | 300℃~1500℃ |
Diameter(OD) | 76mm~914mm |
Product Display